
Items : %s%s
CDLL250
CDLL250
523-CDLL250
DO-213AB, MELF (Glass)
2 Terminations2 Pin Current regulator-65°C~175°C
In Stock : 999
Share
Please send RFQ, we will respond immediately.








Product Details
Purchasing and Inquiry
CDLL250 Overview
Buck boost converter is part of the package Bulk.Depending on how DO-213AB, MELF (Glass) packages voltage regulator, voltage regulator will be packaged in the same way.This electronic part is mounted in the way of Surface Mount.As a rule of thumb, the operating temperature should not exceed -65°C~175°C.The input voltage of 25V can be supported by this voltage regulator.The 2 termination is a method for terminating a transmission line by connecting a voltage regulator that matches its characteristic impedance, which is the method of terminating a transmission line with a voltage regulator.2-pins are pronged contacts that form part of a computer's or other constant current regulator's signal interface.Taking into account the output current of 5.10mA, it is able to provide maximum design flexibility for the designer.1 elements make up this graph.As well as being characterized by METALLURGICALLY BONDED, constant current regulator is also characterized.
CDLL250 Features
Bulk package
1 elements
CDLL250 Applications
There are a lot of Microsemi Corporation CDLL250 Current Regulation/Managements applications.
- Vehicle dynamic controls
- Battery management
- Diesel injection controls
- DC motor control
- Suspension controls
- Over-current protection
- Level translating
- Transmission controls
- Smart battery packs
- Power supply current measurement
You can send an inquiry by email, or add the item to the RFQ list and submit it to us.
Tell us the model and quantity you need, our sales staff will reply the price in time.
Email for receiving inquiries: jindawei@hkjdwchip.com
For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and wire transfer.
3. RFQ (Request for Quotations)It is recommended to request for quotations to get the latest prices and inventories about the part.
Our sales will reply to your request by email within 24 hours.
1. You'll receive an order information email in your inbox. (Please remember to check the spam folder if you didn't hear from us).
2. Since inventories and prices may fluctuate to some extent, the sales manager is going to reconfirm the order and let you know if there are any updates.
Shipping starts at $40, but some countries will exceed $40. For example (South Africa, Brazil, India, Pakistan, Israel, etc.)
The basic freight (for package ≤0.5kg or corresponding volume) depends on the time zone and country.
Currently, our products are shipped through DHL, FedEx, SF, and UPS.
Delivery TimeOnce the goods are shipped, estimated delivery time depends on the shipping methods you chose:
FedEx International, 5-7 business days.
The following are some common countries' logistic time.
Payment Method
The fee is charged according to the rule of PayPal. | |
East West Bank charge US$30.00 banking fee. | |
The fee is charged according to the rule of PayPal. | |
Western Union charge US$0.00 banking fee. |
Shipping
DHL(www.dhl.com) From $40.00 basic shipping fee depend on zone and country. |
|
UPS(www.ups.com) From $40.00 basic shipping fee depend on zone and country. |
|
FedEx(www.fedex.com) From $40.00 basic shipping fee depend on zone and country. |
|
Registered Mail(www.singpost.com) From $10.00 basic shipping fee depend on different zone and country. |
Package
![]() |
![]() |
![]() |
![]() |
![]() |
CDLL250
technical specifications, attributes, parameters and parts with similar specifications to CDLL250.
Hot Sales in Thermal
Parts with Similar Specs
The three parts on the right have similar specifications to Aavid.
-
ImagePart NameManufacturerHK JDW NOPackageStockDataSheet:Compare:
-
Microsemi523-JANS1N5298-1DO-204AA, DO-7, Axial2-3 DaysAdd Compare
-
Microsemi523-JANTX1N5310UR-1DO-213AB, MELF (Glass)2-3 DaysAdd Compare
-
Microsemi523-JANTX1N5311UR-1DO-213AB, MELF (Glass)2-3 DaysAdd Compare
-
Microsemi523-JAN1N5314UR-1DO-213AB, MELF (Glass)2-3 DaysAdd Compare
-
Microsemi523-JANTXV1N5283UR-1DO-213AB, MELF (Glass)2-3 DaysAdd Compare
-
Microsemi523-JANTXV1N5309UR-1DO-213AB, MELF (Glass)2-3 DaysAdd Compare
-
Microsemi523-JANTXV1N5305UR-1DO-213AB, MELF (Glass)2-3 DaysAdd Compare
-
Microsemi523-JANTX1N5300UR-1DO-213AB, MELF (Glass)2-3 DaysAdd Compare
-
Microsemi523-JANTXV1N5290UR-1DO-213AB, MELF (Glass)2-3 DaysAdd Compare
-
Microsemi523-JANTXV1N5294UR-1DO-213AB, MELF (Glass)2-3 DaysAdd Compare