
Items : %s%s
BS170-D75Z
BS170-D75Z
598-BS170-D75Z
TO-226-3, TO-92-3 (TO-226AA) (Formed Leads)
MOSFET (Metal Oxide) N-Channel Tape & Box (TB) 5 Ω @ 200mA, 10V ±20V 40pF @ 10V 60V TO-226-3, TO-92-3 (TO-226AA) (Formed Leads)
In Stock : 999
Share
Please send RFQ, we will respond immediately.








Product Details
Purchasing and Inquiry
BS170-D75Z Overview
As an op amp's input capacitance parameter, CI, is defined as the capacitance between the input terminals when one input is grounded, this device's maximum input capacitance is 40pF @ 10V.0.5A is the drain current of this device, which is the maximum continuous current transistor can carry.In order to maintain normal operation, it is recommended to keep the DS breakdown voltage above 60V.Operating this transistor requires a 60V drain to source voltage (Vdss).By using drive voltage (10V), this device helps reduce its overall power consumption.
BS170-D75Z Features
a 60V drain to source voltage (Vdss)
BS170-D75Z Applications
There are a lot of ON Semiconductor BS170-D75Z applications of single MOSFETs transistors.
- DC-to-DC converters
- General Purpose Interfacing Switch
- Power Tools
- Motor Drives and Uninterruptible Power Supples
- Load switching
- LCD/LED/ PDP TV Lighting
- Consumer Appliances
- Motor drives and Uninterruptible Power Supplies
- Power Management Functions
- Motor control
You can send an inquiry by email, or add the item to the RFQ list and submit it to us.
Tell us the model and quantity you need, our sales staff will reply the price in time.
Email for receiving inquiries: jindawei@hkjdwchip.com
For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and wire transfer.
3. RFQ (Request for Quotations)It is recommended to request for quotations to get the latest prices and inventories about the part.
Our sales will reply to your request by email within 24 hours.
1. You'll receive an order information email in your inbox. (Please remember to check the spam folder if you didn't hear from us).
2. Since inventories and prices may fluctuate to some extent, the sales manager is going to reconfirm the order and let you know if there are any updates.
Shipping starts at $40, but some countries will exceed $40. For example (South Africa, Brazil, India, Pakistan, Israel, etc.)
The basic freight (for package ≤0.5kg or corresponding volume) depends on the time zone and country.
Currently, our products are shipped through DHL, FedEx, SF, and UPS.
Delivery TimeOnce the goods are shipped, estimated delivery time depends on the shipping methods you chose:
FedEx International, 5-7 business days.
The following are some common countries' logistic time.
Payment Method
The fee is charged according to the rule of PayPal. | |
East West Bank charge US$30.00 banking fee. | |
The fee is charged according to the rule of PayPal. | |
Western Union charge US$0.00 banking fee. |
Shipping
DHL(www.dhl.com) From $40.00 basic shipping fee depend on zone and country. |
|
UPS(www.ups.com) From $40.00 basic shipping fee depend on zone and country. |
|
FedEx(www.fedex.com) From $40.00 basic shipping fee depend on zone and country. |
|
Registered Mail(www.singpost.com) From $10.00 basic shipping fee depend on different zone and country. |
Package
![]() |
![]() |
![]() |
![]() |
![]() |
BS170-D75Z
technical specifications, attributes, parameters and parts with similar specifications to BS170-D75Z.
Hot Sales in Thermal
Parts with Similar Specs
The three parts on the right have similar specifications to Aavid.
-
ImagePart NameManufacturerHK JDW NOPackageStockDataSheet:Compare:
-
ON Semiconductor598-2N7002LT1GTO-236-3, SC-59, SOT-23-32-3 DaysAdd Compare
-
ON Semiconductor598-BSS138KTO-236-3, SC-59, SOT-23-32-3 DaysAdd Compare
-
ON Semiconductor598-BSS138LT1GTO-236-3, SC-59, SOT-23-32-3 DaysAdd Compare
-
ON Semiconductor598-NTA4153NT1GSC-75, SOT-4162-3 DaysAdd Compare
-
ON Semiconductor598-NVR5198NLT1GTO-236-3, SC-59, SOT-23-32-3 DaysAdd Compare
-
ON Semiconductor598-BSS138LTO-236-3, SC-59, SOT-23-32-3 DaysAdd Compare
-
ON Semiconductor598-NDS0605TO-236-3, SC-59, SOT-23-32-3 DaysAdd Compare
-
ON Semiconductor598-2N7000TATO-226-3, TO-92-3 (TO-226AA) (Formed Leads)2-3 DaysAdd Compare
-
ON Semiconductor598-FDB24AN06LA0TO-263-3, D2Pak (2 Leads + Tab), TO-263AB2-3 DaysAdd Compare
-
ON Semiconductor598-FDI2532TO-262-3 Long Leads, I2Pak, TO-262AA2-3 DaysAdd Compare
-
ON Semiconductor598-FDD16AN08A0-F085TO-252-3, DPak (2 Leads + Tab), SC-632-3 DaysAdd Compare